GE is considering to reduce production at its thermocouple the introduction of a “just-in-time” production system inventory. The case provides students with a description of the present ERP system, the production, and the perspectives of the various people in the system. The question is how GE should go with the introduction of this system.

GE is considering to reduce production at its thermocouple the introduction of a “just-in-time” production system inventory. The case provides students with a description of the present ERP system, the production, and the perspectives of the various people in the system. The question is how GE should go with the introduction of this system.
«Hide

from
David A. Garvin,
Suzanne Detreville
Source: Harvard Business School
15 pages.
Publication Date: Dec 12, 1983. Prod #: 684040-PDF-ENG
General Electric – Thermocouple Manufacturing (A) HBR case solution